Choosing Materials

The green building movement makes a big deal about choosing the right materials to ensure a product can be reused or returned to the raw material market at the end of the life-cycle.  The end goal is of course to reduce the embodied energy of the project.

While this is a lofty ideal and worth pursuing, a reality check often shows that while a material is technically recyclable, there often (usually) not programs in place to actually process the used material.  During the deconstruction of my house, I ran into two good examples.

My kitchen floor was pure linoleum tiles (essentially linseed oil).  This is a product that can be composted or used as fuel for large scale heating boilers.  But in my region, there was no program set up to process the product and I ended up taking it to the landfill (I did not have the facilities to grind up and compost myself).

The second product I failed to recycle was all of the plastic pipe I salvaged from below grade.  This included PVC drainage pipe, PVC irrigation pipe, and ABS sewer pipe.  For this commodity, there was a program in place to recycle the material, but only if it was VERY clean (think like new).  The process available could not handle pipe with any dirt or other sediment on it.  SO in the end, it too had to go to the landfill.

Misc Pipe and Plastic that was not accepted at recycling facility.


While we should endeavour to reduce our footprint on the planet and choose materials with lower embodied energy, we should also ensure that the materials we do choose are the most suited to the application.

I see too many 'green' building designs that choose a 'green' product due to a promised carbon footprint as the primary focus, without ensuring the product will be durable long term in service. This often will result in the need to replace the product after a very short life cycles.  Even if the product can be returned back to the raw material supply chain, this still represents an increased burden on the planet compared to a competitive product that while being less 'green', is more durable in service.  And if the 'green' product cannot be returned to the supply chain, you are just that much further behind.

Instead, my focus is to start at the most durable end of the spectrum and then try to pick products with lower embodied energy characteristics from the high performance candidates, AND install the products per best practices to ensure they are as useful and durable as possible.

My long term hope is that the cost of new materials becomes so high that even the main stream players in the market see recycling as a no-brainer.  This would address the fact that right now, recycling often does not make sense from strictly a financial platform.  However part of the problem is also the technical challenges in recycling a product.

Fortunately, there is some visionaries that have been working for many years to solve some of these hurdles. Mike Biddle has been working on a system that can separate bulk shredded plastics into the different colours and materials solving one of the biggest stumbling blocks to mass recycling of plastics (read PopSci article for full storey).  The beauty of his system is that this is all done in N.A., saving the need to ship offshore, via an automated process (no high labour costs). By keeping the product on our shores, we reduce the pollution our society is creating within poorer countries.

Lets hope others are working on the myriad of other materials we as a society currently just discard.

Mike Biddle has developed an automated (IE cheap - labour free) method of allowing plastic materials to be ground up on mass and then separated into the individual colour and materials making up that mass.

Friday, 28 March 2014

Variance Approved and Website Launched!

Wow, a lot has happened since my last update. 

For starters, we have moved.  You can read about the first few days of the move over on my journal at theEnclosure.ca It was a tiring and stressful time that I am very happy is behind me. Of course this was followed up by a week of sickness and a computer data loss that was the worst I have had ever experienced but fortunately I have been very lucky in this regard and so this was not crippling for me (just expensive - the whole affair cost over $1000 for data retrieval and the purchase of a second battery backup so both my Raid servers are protected).

The next piece of big news is that our Development Variance permit was approved last Monday night.  This was such a relieve after months of back and forth with the District.  They accepted my originally proposed upper to lower floor ratio of 87% (vs. the 75% required by the bylaw), but I had to redesign the roof so that I could lower it 12" and now only be 8" above the requirement of 26'.  This has resulted in the loss of my air barrier design utilizing a torch on membrane, so I will have to come up with a new game plan for creating a durable and effective air barrier at the ceiling location. Ideas anyone?

We have also been approved for our Construction Mortgage and I am thankful for the hard work put in by Tetyana Thomas at the Royal Bank.  They have really stepped up compared to most banks that would not loan to an owner builder. The challenge will now be to get to the first draw.  They will not advance funds until the foundation is complete.  This will cost well over $100K to get to with all of the permit and engineering costs built into this phase. I am still not sure where this money will all come from and we are going to need to do some MacGyving to get through this stage.  The ironic part is that they are then willing to advance 40% of the land value at the first draw which is ALL of the funds I will need to finish the project.  The appraised value for the finished structure is over $2M in today's market and they felt I should be spending over $800K to build.  I expect to spend less than half this due to my own sweat equity, salvaged materials, sponsorship, and a lower importance that both my wife and I share towards the 'lipstick' of a house.

Yesterday, I also received the final sealed drawings from the Structural Engineer and the GeoTech report.  This is the last part of the puzzle needed to apply for the Building Permit which I will do next week. Unfortunately the first appointment available was Thursday as I will be at a THERM training course all day Monday and Tuesday.

The gas/storm/sani/water services should all be disconnected next week and I will have Hydro swing the electrical service over to the new temp pole as soon as I finish installing it and call for inspection.  I hope to get this done this weekend.

But the greatest achievement was the launch of the project's website theEnclosure.ca I cannot thank Honeycomb Creative enough for their work on this site.  It is first rate just like all of the other work they have done for me.  I invite you to stop by and browse through the information that is available including a full copy of the plans, building assembly descriptions, and lets not forget the 'live' (actually snapshots updating every 3-5 seconds) video of the build site.

As I get caught up, I will post more information on the Varriance process for those that may need to go through a similar process.

As always, thanks for stopping by!


Thursday, 27 February 2014

Pacific Northwest National Labratory develops a new Algae fuel ready in about an hour.

Diesel created by algae has been on the radar for a few years now but is still only available in low volume pilot plants and is heavily subsidized.  Once of the largest stumbling blocks has been the energy needed to create the dry algae used by the previous processes.

PNNL has created a process that can work with wet algae (80% water) saving vast amounts of energy and time.  Their new process creates usable crude in as little as one hour.  The process also allows for usable gas to be extracted from the waste water stream increasing the efficiency of the process even further.

This is a large step in the right direction in getting the process closer to the efficiency and scalability needed to compete with the fossil fuel market.

You can read more about this innovative process here.

The process starts with whole green algae slurry with water contents between 80% and 90% (Photo extracted from PNNL)
Under high pressure and temperatures that mimic the conditions found deep in the earths crust, the slime is converted into a light crude that can be refined in a traditional manner into gasoline, diesel and jet fuel. (Photo extracted from PNNL)



Saturday, 11 January 2014

SENWiEco adds a weather station.

As part of the instrument package for the new build, I have installed a Vantage Pro2 Plus weather station.  I have had this recording weather since September of 2013, but only setup the web based access today.

My blog will show the current conditions, but clicking on the icon will take you to the station on the Weather Underground website where you will be able to look at historical data.

The station is currently uploading saved data and should be 'live' by tomorrow.

Enjoy!



Thursday, 19 December 2013

FPInnovations - Guide for Designing Energy-Efficient Building Enclosures

Whether you are designing single or multi-family dwellings, this Wood-Frame Multi-Unit Residential design guide  from FPInnovations is packed with valuable design information and the relevant science behind each design.

Sponsored in part by the Homeowner Protection Office and prepared by RDH Building Engineering, the 244 Page guide contains information on building energy efficient assemblies in various configurations including split insulation, double stud, mass timber, and wood frame infill.


While I chose to not build to any of these specific assemblies in my dwelling, my design still relies on the fundamental principles expressed and recommended in this guide.  I have also had the privilege of attending many of the lead author's (Graham Finch - RDH) building science courses and seminars over the last 3 years.  His knowledge and ability to disseminate the information in an understandable manner has helped me immensely in my ability to absorb and understand the key building science principles discussed throughout this guide, including the importance of assemblies that can perspire, as well as the importance and impact of reducing thermal bridging.

Whether building a code minimum house or going to the other extreme and building a Passive House, this guide has got something for you and should be part of your reference library.

I give it two thumps up!

Sunday, 15 December 2013

Corn Based Ethanol - Why?

Like the author of an article I just reviewed, I too question the logic of creating 'fuel' from food crops.  Why would we create an industry that takes food out of our mouths while at the same time most likely consumes more energy than it produces.

Alex Wilson of GreenBuildingAdviser.com wrote in his article 'Ethanol Under Fire'

"Depending on whose study you believe, it either takes a little more or a little less energy to produce corn-based ethanol than that end-product contains. That EROI ratio ranges from 0.8:1 to 1.5:1, depending on the study."  "Any time the EROI is less than 1:1, it takes more energy to produce the fuel than the fuel contains. Even giving the ethanol industry the benefit of the doubt by assuming the actual EROI is 1.5:1, that means to produce a gallon of the fuel takes two-thirds of a gallon (equivalent) of fuel — diesel for tractors and combines on the farm, natural gas to produce nitrogen fertilizer, natural gas and electricity at the ethanol plant, and energy to ship that fuel around the country." "By comparison, the ethanol produced from sugar cane in Brazil has an EROI closer to 8:1 — for every gallon (equivalent) invested you get about eight gallons back out.
No matter whose numbers you believe, from an energy standpoint turning corn into ethanol to fuel our cars makes little sense."

Giving the politicians the benefit of the doubt (I know - extremely generous), they want to do the right thing! 

But we have to start focusing our resources and research in more intelligent ways, at least for the immediate future while we deal with the emergency on hand - Global Warming.  How much public funds has been misdirected and abused by research and subsidies on schema that will never result in a significant reduction in the burning of fuels that cause global warming (look at the hydrogen fuel cell as another great example)?  At this critical time, we need to concentrate on options that at least on paper have a significant chance of a healthy EROI. 

How much time have we lost going down these dead-end roads.  After all, time is of the essence if we have any chance of effecting the outcome!

Thursday, 31 October 2013

Thank-you Readers!

You are all awesome!

I am now over 650 hits per month on this blog and I cannot thank you enough.

First, it shows a strong interest in the subject matter. Second, it keeps me very motivated to continue posting, and obviously I need to actually keep making progress on the project if I am to have something to post, so you are helping keep the project moving along.

Finally, it shows potential sponsors of the project, that there really will be great exposure for any products that I showcase in the blog and official building site (to be launched early spring).  And any sponsorship received, will ensure an even better and educational website and building lab.

Click to enlarge

Thursday, 17 October 2013

We have an engineer!

As regular readers will know (previous discussion on the topic), I have struggled to find the right structural engineer for my project for a very long time now.  

The process started last March when I chose someone who had a structural issue with 2x4 framing and wanted to put an 8" concrete core inside an ICF.  On the first rear day of activity, he thankfully advised this was not the job for him, something I was in total agreement with.  But this left me in a real pickle, as I initially had planned on starting construction this last spring.  After frantic calls to other engineers showed that no one would be available on short notice, my wife and I discussed and decided that putting the project off a year made the most sense (I did not want to start any later than May 1 in order to get the roof on before the October rains).  And in hindsight, I was no where near ready to start this year anyway and had a lot of technical challenges that still needed to be worked through. So all in all, the delay has been for the best.

Because, I had been 'full tilt' for several months up to the March debacle, I used the decision to delay a year as an excuse to 'take a break'.  The problem is that a break becomes far too comfortable and weeks very soon turn into months.  The last 'break' I had been on took a year!  Fortunately I was a bit more disciplined this time and started the design engine up again in late May.  I received a list of ICF friendly engineers through my good buddy Murray Frank, and started contacting each of them to see if they had the time to fit in my project.  I was finding that between people that did not do ICF anymore, were totally out of business, did not do residential, were not interested, or just did not have the time, my options were limited.

I settled on fellow recommended by people on my first list, who promised a 2-3 week turnaround when I met in his office, but after 6 weeks, not only had we not started, but he had never returned a call or email.  I thought, if we start out this way, how long is it going to take to finish the task and decided to cut my losses before I wasted any more time.

I then contacted some of the people that were previously too busy and some new names I had been given.  I was left with 3 or 4 people willing to take on the work, but based on their own terms.  This generally meant they wanted to take over complete control of the design and move all structure out of Part 9 of the BC Building Code (A prescriptive path to construction) and into Part 4 (An engineered path for all structure).  I just needed assistance on items I could not meet prescriptively like beam sizing and engineered floor and roof trusses, and of course the ICF foundations (and only those because I am a bit higher than the prescriptive code allows for).  The all encompassing engineers wanted to do up pages of detail drawings and in some cases even choose the products I was to use.  And they wanted to charge me $15K+ for the privileged! (my original engineer from March quoted $2500).  This was my design, I had already drawn it up in both 2D AND 3D.  I had already drawn up many of the details I wanted to figure out before building to ensure they worked and were buildable.  I knew what I wanted to build and knew how to build it.

The problem with Part 4 is also that it was going to cost me a lot more money to build. For instance, the Part 9 prescriptive approach requires very little if any manufactured anchors for braced wall panels.  As long as you have the right volume of panels per floor, you can use conventional framing with plywood and everyday nails to build these panels, whereas the Part 4 system often make exclusive use of the Simpson StongTie anchors and rods.  These can add thousands to a typical build.   I had already designed the dwelling to the Part 9 Seismic requirements and did not need any assistance in this regard.

I DID NOT NEED THIS PREMIUM SERVICE and in fact most of this effort would have just been wasted!  I could also tell, that preserving the integrity of my design and my ideas for thermal bridge reduction was going to be difficult with several of the individuals.

So at the end of August I threw a 'Hail Mary' and contacted a name I had received from Durisol (ICF block manufacturer) back in March.  I had originally dismissed the name because they worked out of Guelph Ontario and I thought how is this ever going to work?.  But I was desperate and so contacted Nathan Proper of Tacoma Engineers and was thrilled in his responses.  He advised that he had a BC stamp and that we could arrange any Building Official required inspections with a local engineer at a very reasonable cost.

He further advised "We would be happy to be involved with your house and to help you out by designing the components which need our design. The approach we normally take with these items is to design only the specific items which the owner asks us to --- these are commonly the items which are not covered by Part 9 of the building code.  This is more cost-effective for the owner than checking every little item." 

I thought I had died on gone to heaven, and my neighbour came out to ask why I was running around the front yard hooping and hollering.  The news literally brought me a few tears as I was so relieved after the conversations I had had with others over the last 6 months.  I had hit the jackpot!  There apears to be a dramatic difference in how the design professionals here operate compared to back east (I have often seen this with other construction related items as well).  The best part - they would charge $5K for the basic design package!

Nathan and his team have been responsive, approachable, and co-operative with my goals and ideals.  They approach the tasks in a straightforward, logical, AND practical matter.  They are also sensitive to my budget constraints and have already made suggestions where I can provide input (drawing) instead of utilizing staff in their office.  We only started the real work on  Tuesday, but I feel we have already made great progress.  I came up with a concept for supporting my sun shade assemblies, and a lot of people I am sure would just ignored my suggestions and done their own thing (often at my increased cost).  But they ran with it and advised it should work and that they had done something similar previously.  I can now be a constructive part of the team instead of a bystander, which is what I had always been looking for.

So, it goes to show, trust your gut.  If something does not feel right, it probably isn't and should be fixed or past over. It took a long time, but I KNOW I have found the right person for the project and will be enhanced by their involvement.

And is that not what you are looking for when you are hiring someone to help you build your house?  

Saturday, 6 July 2013

Geothermal and Liquid Thorium Reactors - Two possible answers to Fossil Fuels.

Just a quick note regarding two promising alternative sources for generating clean energy.

The first was spurred on by a Knowledge Network documentary I watched this evening on Enhanced Geothermal Systems (EGS).  This is a process being develop to bring Geothermal potential to regions of the world that do not have easy access to hot rock, water reservoirs, and fracturing of the hot rock to allow harvesting of the steam (currently only accompanying about 10% of the earths surface and may be expandable to 60-80% utilizing EGS).  The process involves creating the underground water reservoir in areas that have dry hot rocks and using techniques from the natural gas industry to fracture the rock after creating a 'man made' water reservoir over a hot rock location (rock in close proximity to Magma).  The result is the same super-heated steam available in true geothermal regions.  The documentary also covers research into new drilling techniques that use flame jet instead of a drill bit to drill through solid granite up to 10X the speed of conventional drilling.

This is a National Geographic production and I was unable to find an official source for the video but did find this YouTube video in English with Portuguese subtitles.

The second potential energy source is new way to create nuclear power.  Nuclear power has created a huge divide between those that support it and those that do not.   On the one hand it can create almost limitless volumes of energy with relatively low emissions.  The catch however is the technology utilized throughout the world is very inefficient (3-5% of the energy is utilized in the fuel rods before they become waste) and this leaves behind spent fuel with a very high radio active content and in huge volumes.  The real drawback is that this waste has a half life in the several hundred of thousands of years.  The final concern, propelled to the forefront after the devastating Japan earthquake in 2011, is that current technology is very hard to stop once it gets going.  The Fukushima nuclear plant will take decades to cool down the cores of the three stricken reactors and decommission the plants (it is taking 3000 people daily to keep the reactors cool, 2 years after the explosions).

But what if another technology existed that would burn the fuel to much higher efficiency,  would created a fraction of the waste volume, the waste would have a half life in the hundreds of years instead of hundreds of thousands of years,  and the fusion process could be shut down almost instantaneously and without human intervention in case of an emergency?  Liquid Fuel Thorium Reactors (LFTR) promise just that. This reprint from the American Scientist is a great introduction to the technology and the missed opportunities that we have had.  It also outlines some of the challenges to switching technologies in the future (mostly political).

Some benifits to LFTR:
  • liquid fluoride salts are impervious to radiation damage eliminating the shutdowns needed to change out traditional fuel rods every 18 months.
  • It is much cheaper to fabricate the fuel
  • Because the liquid fuel does not break down due to thermal cycling and radiation, it can stay in service until a much higher percentage of the fuel if burned up
  • Fission poisons like Xenon (materials that absorb electrons reducing the output of the fission process) are easy to remove from liquid fuel because the bubble to the surface. Other unwanted materials are easily removed from liquid fuel by fluorination or plating techniques, greatly prolonging the viability and efficiency of the liquid fuel.
  • Wastes created byLFTR only need a few hundred years of isolated stroage vrs a few hundred thousand years for sold fuel rods.
  • The liquid salt coolant in a Salt Nuke is not under pressure (reduces the cost by not requiring a pressure containment building)
  • A Salt Nuke can be designed to auto extinguish during any calamity that causes a power failure.  Once a frozen salt plug melts, the core would dump into a sub-critical catch basin.

Friday, 5 July 2013

China or Paper - What should you eat off of?

GreenBuildingAdvisor.com looks at the energy and carbon comparison between disposable plates and china plates. http://goo.gl/OYn5C

As usual, the results are not black and white and highly depended on how the china is washed.

Wednesday, 3 July 2013

Light House completes Pilot Project on Deconstruction

Light House Sustainable Building Centre Society completes pilot project analyzing the costs and time needed to deconstruct part of a single family residence before renovation.

Their report, published here, indicates there are some savings to be realized under some conditions, but that we have a long way to go before this can be common place.

As my time is 'free', I plan to spend up to a month deconstructing my house before starting construction on my upcoming build.  The items I plan to reuse, sell, salvage, give away, and recycle include:

  • Studs and joists - Reuse/Donate/Recycle (They can be ground up and added as a soil conditioner - Clearview Grinding Ltd).
  • Plywood - Reuse/Donate
  • Ship lap - Recycle
  • Shingles - Recycle (http://www.gemacosales.com)
  • Exterior Concrete bricks - Reuse/Sell/Donate
  • Cedar Siding - plane down to remove paint to reuse and sell.  The stuff is 1.75" at the narrow end.
  • Wiring, metal piping, bathtub and sinks - Salvage (will need to strip insulation of wiring for best prices, a job that will be left till after construction).
  • Drywall - Recycle
  • Light & Plumbing Fixtures - Reuse/Donate
  • Plastic Piping and other plastic products - Recycle (www.pacificmobiledepots.com takes any plastics that cannot go into the curb side blue box)
  • Solid Wood flooring Reuse/Sell/Donate
  • Bath and Kitchen Cabinets - Reuse (Shop)/Donate
  • Stove and Dishwasher - Recycle (they are both beyond there service life and are being babied to last this last year)
  • Fridge - ReUse (we just bought it a few years ago)
  • Aluminum window frames - Salvage
  • Window blinds/Shower Door/Boiler - Donate
  • HWT - Reuse or dontate
  • Laundry appliances - Reuse for while then donate
  • Electrical Panel - Reuse as sub-panel (newer 200A panel)

Stuff that will probably go to the landfill:
  • Interior and Exterior Doors
  • Single Pane Glass
  • Painted Wood
  • Insulation (very old mineral wool and some fibreglass)
  • Counter tops (laminate)
  • Ceiling tiles (may be hazardous)
The last item is the concrete slab.  I would like to have it ground up and be able to use it as additional granular material for back-filling but at the very least I will find a place where it is needed as fill.

As you can see, my plans are ambitions and if successful, I would  divert over 90% by weight or volume away from the typical landfill process. Some of the effort like stripping the wiring or the paint of the siding will have to wait till after the build process. But with some planning and a little hard work, this should all be easily achievable, bring in some income or good karma and significally lower the carbon output of my demolition process.

Thanks for reading and as always, I encourage your comments.
 



Thursday, 13 June 2013

Do energy targets of Passivhaus make sense and will they pay back during the lifespan of the dwelling?

I have been discussing the payback periods of Über high levels of insulation and high R value windows on LinkedIn and thought I would share my thoughts with you and possibly promote a discussion.  My comments on LinkedIn started after one participant wrote “PS: BTW, why are we talking about this in the PH forum? Aren't we all allergic to any heating other than auxiliary heaters?”.  This was a topic asking for advice on whether it made more sense to install an Air Source Heat Pump or a High Efficiency Furnace on a home that currently had an oil furnace at the end of its service life.  The dwelling of concern was not a Passivhaus, but the poster felt that the expertise of the Canadian Passive House Institute forum may be beneficial to his decision.

I commented that I felt the jury was still out on the need for a heating system in a Passivhaus design for our climate, and that in most examples I have reviewed the only way it has ‘worked’ to not have a ‘real’ heating system (many designs incorporate a hydronic or electrical resistive heating coil in the dwellings ventilation air ducts to provide ‘auxiliary’ heat), is when the occupants were willing to accept significantly lower temperatures (<+ 65°F) during cold days and nights, which is just not going to be acceptable for most occupants in North America.  But the PH Program uses the claim that a normal heating plant is not needed as a way to justify spending the extra money on extreme amounts of insulation, which in many regions will never have a reasonable chance of payback throughout the life span of the dwelling.

If you accept that some form of heating plant will be required, but through increased insulation and better windows, that plant can be substantially downside, logic would say that the smaller plant will save you money and allow for the extra expense on the insulation and windows needed to reduce your heat load and downsize your equipment.  See the circle hear.  Well logic unfortunately has nothing to do with the pricing of consumer goods.  Pricing has nothing to do with the actual cost to make an item and everything to do with how badly does the consumer want it and what are they willing to pay.  Because the average North American consumer lives in a McMansion and has a bajillion gigawatt heating plant, there is very little demand for small 10-15K BTU units that are needed in a very energy efficient home.  The result is that they cost a lot MORE than the much larger units installed in the ‘average’ homes.  So not only are you spending a lot more money on windows and insulation, you now have to triple your HVAC budget even though you are getting less.

Another poster then suggested reducing the heating load by first “renovating to Passive House-Retrofit standard with R60 Wall, R90 Roof and R50 under-slab insulation, replacing your windows with R19 Ecoglass and PH doors”.

How long of a payback is and will be acceptable to most homeowners/buyers? Does R50/60/90 (slab/wall/roof) EVER make sense in the vast majority of climates around the globe? Are windows really able to reach a R20 thermal efficiency for the total assembly?

This then lead to a new discussion topic about windows, the claims by window manufacturers (in this case EcoGlass claiming a R20 window), and the general payback metrics of the Passivhaus program and what makes sense. 

In my travels I have generally been exposed to three trains of thought when discussing the Passivhaus program; those that have drank the full pitcher of Cool-Aid and take everything at face value and run with it, those that completely dismiss the program’s claims (these tend to be people who do not believe in Global Warming or the need to reduce energy use or our carbon footprint) and often call the practitioners of the program charlatans, and finally those that can see the value in a program like Passivhaus and see the building science wisdom in many of the program’s concepts but also feel the program may go too far down the energy reduction path.

I fall squarely into the last category.   I believe we are having a detrimental effect on the environment and need to make changes in how we build and live.  Yes I plan to build a ‘close to PH’ dwelling.  I believe that PH has the right focus when designing a dwelling, unlike LEED/Built Green/or other ‘green flavours’ of the year, that are more focused on the small to minor contributions that reduce the carbon footprint, and not ensuring the elephants in the room like heat load and thermal bridging are first looked after.  How many times have we seen a LEED Platinum building with 60-80% glazing and wondered how could that building possible be energy efficient and good for the environment? 

Building a dwelling that has reduced thermal load achieved by increased insulation, reduced thermal bridging, increased air tightness, reduced window glazing with the glazing present having higher insulating value or better solar gain harvesting, utilizing south solar gain when available, and of course correct ventilation (all the fundamental building stones of the Passivhaus system) just makes sense from a building science and energy reduction point of view. 

And concentrating on your insulation and air tightness as the first and highest priorities also makes common sense, because you will most likely never get another chance to address these components during the life of that dwelling due to their inaccessibility.   So it makes sense to concentrate more of the available funds to maximizing the efficiency of these soon to be inaccessible components and calculating the optimal insulation levels based on a full life of the building cycle (20, 30, 50, 100 years?).  Components like windows and heating plants are far less important to optimize during the initial construction, when working with a limited budget (a reality for all except a select few), because both will need to be, and most importantly can easily be, replaced or upgraded in 15-20 years at the end of their service life.

But I agree with many, that the PH program goes far too far up the pendulum in its goal to reduce the energy load on a dwelling, to a point of drastically diminishing returns that are not acceptable or practical for most in North America and in my view, may actually be increasing the building’s footprint on this planet (incorporating embodied energy in a dwelling that will never be offset with energy savings).

I also feel that so often the costs to build to PH standards are grossly misstated.  I often see figures of +10% to +20% as the premium to build to the standard.  In reality it is usually at LEAST 2 – 2.5 times the cost of a house built to building code minimums.  I have seen several examples of houses built in cities in my region for under $100/sqft over the last year or two (for a 3500 – 4000 sq ft dwelling).  These are house designs that do not utilize an architect or building envelope engineer on the team, and often have only minimal structural engineering input because they are generally optimized to meet the BC Building Code’s Part 9 prescriptive rules.  They still have fancy kitchens with gas stoves and granite countertops, a gas furnace or boiler, crown mouldings, and fancy paint schemes. They however usually incorporate PVC or vinyl windows of dubious quality (R2 max and air leaky like a sieve), code min insulation levels, and no air tightness to speak of.  The types of houses build by a majority of developers/builders in the majority of cities in my region (The only City’s that buck that trend in my area are the west side of Vancouver and North and West Vancouver).   A PH on the other hand requires the use of all the specialists (for one, because no Municipal inspector is going to take responsibility for the design and you have to have an engineer sign off on every aspect of the design).  Now you are looking at $200+ per sq ft to build minimum and that is if all the rest is par with a code min dwelling.  But clients who entertain a PH typically also still want all the bells and whistles including custom cabinets, media rooms, and home automation, and so on with the costs quickly escalating to $350/built sq ft or higher.  I am often directed to the stats for countries like Germany where a PH represents at least 25% or more of all new house builds.  There is a very good reason; a builder gets a huge government grant to build to the standard, the size of the grant reportedly offsets that bulk of the added expense to build to the program.

My final concern about the program is that it is not even possible in so many locations.  In order to meet the energy targets and not have a requirement for insane levels of insulation, a Passivhaus relies on solar heat gain (SHGC) to provide a large portion of your heat during the sunny winter days and shoulder month seasons.  This is obviously only possible if you have an unobstructed view of the sun (and of course have Sun) on your south elevation.  In an urban environment, this probably represents less than 10% of the available build opportunities which make the program quite elitist and limited in its ability to apply on mass.
 
I value the work that the Passivhaus community has done around the world and applaud there tenacity for building quality homes. I however personally would much rather see the energy use requirements lowered 20-30% and applied on mass to all new construction by means of building code requirements.  Only then will we truly make a difference in the carbon emissions and fossil fuel outputs of our society and substantially reduce our dependence on fossil fuels in North America.  Fortunately, I live in a Province that is leading Canada if not North America down this path with its new requirements for ever increasing insulation, ensuring for the first time that doors and skylights have to meet the same minimum air tightness requirements as windows, and hopefully really soon, will require an air tightness demonstration that meets a minimum level at the end of construction.

As always, thanks for reading and I look forward to your comments.

Determining the Lifespan of a Dwelling

In order to determine the payback of the various design decisions needed in a new build (or even a renovation), you need to first determine the most likely lifespan of the dwelling you are designing.  Many Europeans would say a home should be around for hundreds of years because many of theirs have been. 

How is this possible? 

Most are built with brick or stone and are in OLD cities.  How old?  Well the Romans were around when many of them were in their infancy. 

Why is the age (maturity) of a city important? 

To answer that we need to look, in contrast, to cities like Vancouver and its surrounding neighbours which are all very young in comparison and changing rapidly.  Single family dwellings on small parcels of land still represent the majority of the housing built and available (when looking at land use and not just total numbers of dwelling units).  As such there is a huge potential for redevelopment as the city matures and grows. 

I live in a large single family neighbourhood 10 minutes from downtown Vancouver.  North Vancouver has predominately been a single family neighbourhood since the early 1900’s.  But it is rapidly changing (many would say for the worse due to the traffic congestion that has developed and really does not have an easy cure due to the geographical challenges of the region).  The District and the City of North Vancouver are both looking to and have been dramatically increasing density in our region with the misguided goal that doing so will make accommodation in our cities affordable.  This has been attempted over and over again in Vancouver, and the facts are that these high density ‘villages’ become sought-after-hot-spots that have some of the highest rental and real estate values in the country if not all North America.  Cole Harbour comes to mind.

I digress, why is the age or maturity of a city important? 

Well, the fast growth of urban areas in my region dramatically shortens the life span of what I feel will be the soon defunct urban single family dwelling.  While my current house was built in 1954 and has had a good run until now, I highly doubt that the house I plan to build next year on this property will come even close to 60 years before it is torn down to make way for a low to mid-rise multi-family housing.  In fact, I would be surprised if it was still around in 25 years.  With its proximity to the Down Town core, Lions Gate Bridge, and Upper Levels highway, it is prime land for re-development; development that is already underway at several nearby locations.  A single family neighbourhood less than 5 minutes from me is slated to become the new Lower Capilano Village.  Another single family neighbourhood within 7 minutes drive has now been bulldozed and is slated to become part of the Lower Lynn Town Centre.

The point I am making, is that it is unreasonable to expect that a single family dwelling built today will still be around in 50, 30, or even 20 years in many neighbourhoods in growing urban centres.  Like the cities that have a much longer lineage than those in North America, there will be a forced march to densification and an abandonment of the single family home on a small distinct plot of land.  Does it therefore make sense to model a home that would have a 50, or worse, 100 year payback in energy savings or carbon reduction in these types of neighbourhoods?  Before coming anywhere close to cancelling out the costs to build or embodied energy of the dwelling, it would be torn down and end up in a land fill. 

So often logic is not part of our design decision making process.  We want something so badly that we will fabricate a way to make that decision sensible.  Designing a home that is SO energy efficiency that it would take 50 or more years to pay back may not actually be helping the planet if that dwelling is only around 20 years.  I hope that more discussions like these will encourage a greater uptake on what makes sense in the larger picture, and start allowing informed well thought out designs that are defensible.

For my part, I believe it will be sensible to apply a 25 year life span when calculating the break even point on the various design decisions I have ahead of me.  If the dwelling is torn down earlier, I will not have left too much on the table, and if it has a longer run, the payback will have already occurred and it will then be providing dividends in carbon reduction and utility bill savings.


As always, thanks for reading and please let me know your thoughts.

Friday, 15 February 2013

The Power of Solar - Yes it works even in Vancouver!

I am sitting here in my home office getting some drawings completed.  The sun is out and recently peaked out from hiding behind a cedar tree (which I will limb to a height of 35ft to get all of the winter sun in the future..  I keep the house pretty cold during the day and have an auxiliary electric cube heater in the office when needed.  The house air temp is around 64ºF.  Surfaces are between 50-65ºF (windows are 56ºF).

In my office that faces south and has the same single pane aluminum frame windows and un-insulated walls.  I have not had the heat on since 9:30 this morning (4 hours ago).  The air temp is 68ºF air temp (started out at the same 64ºF but within 30 minutes of direct sunlight spiked up), but the real difference are the surfaces.  The window is 72ºF!  All the other surfaces are between 66ºF and 75ºF depending on how much direct solar energy they are absorbing.

Pretty phenomenal really, if I can build a house that captures as much of this solar gain through the south side as possible why still significantly reducing the thermal loss through the envelope, I will be laughing all the way to the bank.

At the last BCBEC AGM, the first presenter was from RDH where they had studied the effects of solar gain on energy use in dwellings.  The end result was that solar heat capture, even in Vancouver!, made sense and resulted in lower energy demands. The sweet spot utilized overhangs to prevent overheating in summer and windows with a 50% SHGC and a thermal resistance of U 0.16.  This resulted in 22500 kWh of annual heating cooling energy.  This was a significant reduction (10%) over the baseline 24500 kWh that utilized only 20% SHGC and U 0.35 windows.

This all of course is only practical if you have south exposure sun available.  I am blessed with unobstructed full sun from around 9:00 AM to 2:00 PM with a couple of sporadic additional hours in the afternoon during the winter months.

Winter Sun will unfortunately be blocked from 2:00 PM til around 3:30 PM




Silence

Hi All,

I just wanted to provide a short update, as I have been a bit delinquent in my postings.  It is crunch time as I come down to and pass deadlines.  I had hoped to apply for permits by the end of January but that has come and gone.  My current plans are for submission by mid March.

Tasks still outstanding:



  • Get site survey (in progress)
  • Get structural engineering to design beams for point loads (hope to send initial drawings by Monday)
  • Design roof trusses and find vendor
  • Get structural engineer to sign off on ICF vendor drawings (if I can get rail freight quote in check, otherwise will probably go with formed foundation)
  • Get structural engineer to design elevated concrete floor slab
  • Design plumbing system (supply and waste)
  • Design electrical system
  • Design fire sprinkler system (will compare cost of installation against operable windows in all bedrooms)
  • Design Upper Master Bedroom Deck
  • Design Low Voltage and Home Automation system (I wanted a fully 'automated' home with relays controlling all lighting circuits, but time is ticking)
  • Design rain water recovery system
  • Design Grey Water Heat Recover System
  • Design Heating and AC system (no small feat as I want to look at solar capture, air source heat pump, and solid fuel boiler)
  • Design Mechanical Ventilation System
  • Finish 3D design (90% complete)
  • Create general materials BOM and get quotes (15% complete).
  • Create schedule (90% complete).
  • Create layouts required by permit app (40% complete)
  • Secure a construction mortgage
  • Bring in 40ft Shipping Container for construction storage
  • Buy a 5th wheel trailer to live in (as long as I can secure permission from District as needs to be in front yard as I have no lane access to back yard)
  • Pack and Move
  • Volunteer at a build site for a day with Alfie in return for building and landscape material I will salvage out of a house before it is torn down.
  • Create a website for the build that will have three live web-cam feeds and hourly time lapse photos along with a wealth of information on sponsored products.
  • Setup project team for the building ‘science lab’ and secure final funding.
  • Oh Ya – Build a house!
My schedule shows that as long as I start the excavation by late May, that I will be able to get the roof on and the building generally waterproof by the October rains. The problem is how much work has to be done prior to this milestone. 

To divert as much material as possible away from the land fill, I will not just bring a tractor in to demolish the house and put in a few large trucks off to the dump.  This is the easy way (takes a day) and the standard way construction is handled in pretty much all of North America.  My plan is to deconstruct the existing dwelling and re-use, sell, free-cycle, and re-cycle as much of the material as possible.  Why is this not done more often?  Labour Costs!  I predict that this task will take 24 man days to complete.  While this only represents $5000 or so of labourer time, there most likely is not $5000 of savings from the reduced dump fees and sale of usable products and scrap metal. 

But I believe that this extra 'effort' will go further in reducing my carbon output from the project than all of the typical 'green-building' program's selections of flooring, cabinets, counters, and paints combined. I will of course still make 'greener' decisions on some internal components, but in general I will be concentrating on the large fruit starting with ensuring a rock solid and efficient building enclosure.

So, this month of deconstruction, packing and moving, and all permit documentation has to be completed before the end of May which is putting me under the vice big time.  I set April 8, 2013 as a theoretical start date back when I first started this blog.  This date was plucked out of the air because it was exactly 500 days from the first blog entry (which had a nice ring to it and seemed like a lot of time).  As I have been completing my schedule, I have been working backwards from Sept 30 (the point I want to have the dwelling generally water tight). 

Last night I finished most of the schedule including most of the prebuild tasks.  I was astonished to see that the beginning of the schedule (start of deconstruction) lands on April 8! 

Is this an omen that everything is falling into place?  I sure hope so!

With schedule close to complete - start date is April 8!


Sunday, 3 February 2013

Peak Oil 'Solved' - But Climate WIll Fry

It is scary when even the oil producers admits we are in trouble and that burning all of that oil may not be in our best interests.

http://www.vancouverobserver.com/blogs/climatesnapshot/peak-oil-solved-climate-will-fry-bp-report

When will we as a society wake up and start forcing our politicians to make a difference?  When will we  start making a difference in our own lives?